Building Fossil Ridge

Two_slabs

These are the slabs for the headquarters building and ,in the distance, the art gallery and conference center.

drill

Getting ready to drill piers for the foundation of Gay’s art studio.

Hanging steel

Steel going into the holes each 13 feet deep.

Poring Concrete

The foundations steel is welded to the steel in the piers, forms are built and concrete poured.

Foundation

A foundation that is not going anywhere.

fossil-ridge-studio-overview-e2028229-l

This shows the studio which will sit on top of the piers.